Eacoon Two-Stage Operation of One-Stage Gas Burner

Product Details
Customization: Available
After-sales Service: Online Technical Support
Warranty: 12 Months
Manufacturer/Factory & Trading Company
Gold Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
179
Year of Establishment
2002-07-04
  • Eacoon Two-Stage Operation of One-Stage Gas Burner
  • Eacoon Two-Stage Operation of One-Stage Gas Burner
  • Eacoon Two-Stage Operation of One-Stage Gas Burner
Find Similar Products
  • Overview
  • Pre-sale Service
  • After-sales Service
Overview

Basic Info.

Model NO.
WZL G20
Type
Induction Heating Machine
Certification
CE, ISO
Structure
Horizontal Type
Brand
Eacoon
Power
50-200kw
Nature Gas Flow
5-20m3/H
Rated Voltage
230V
Frequency
50Hz
Motor Power
0.37kw
Net Weight
26kgs
Packing Size
880*565*440mm
IP Grade
IP40
Transport Package
Standard Packaging
Specification
422*263*800mm
Trademark
Eacoon
Origin
China
HS Code
8416201190
Production Capacity
5000

Product Description

Eacoon Two-Stage Operation of One-Stage Gas Burner
Eacoon Two-Stage Operation of One-Stage Gas Burner
 
 
 
WZL G20 Two-Stage Operation of One-Stage Gas Burner 
 
1.Gas Burner.
2.Two-stage operation (high/low flame).3.Air-gas mixing at blast-pipe.
4.Ability to obtain optimal combustion values by regulatingcombustion air and blast-pipe.
5.Maintenance facilitated by the fact that the mixing unit canbe removed without having to remove the burner from theboiler.
6.Minmum and maximum air flow regulation for first andsecond stage by means of electric servomotor with pauseclosure of gate to prevent any heat dispersion to flue.
7.One flang and one insulating seal for boiler fastening.
8.Combustion air intake with air flow adjustment device.
9.Sliding boiler coupling flange to adapt to head protrusionof the various types of boilers.
10.Monophase electric motor to run fan.
11.Flame presence check by photoresistance.
12.Electrical plant protection rating IP40.
 
Burner Model A B1 B2 C D E F M N L I No.
mm
WZL G20PF 422 263 102 800 120~280 135 114 M10 140 170~210 185 2
WZL G30PF 422 263 102 1090 170~300 135 135 M12 145 200~245 215 2
WZL G35PF 422 263 102 925 130~300 155 135 M12 160 200~245 215 2
Burner Model Natural Gas Flow Power KW Power Supply Motor Power KW Net Weight KG Packing Size LxPxH mm Remark
WZL G20PF 5~20 50~200 230V 50Hz 0.37 26 880x565x440 carton
WZL G30PF 6~30 60~300 230V 50Hz 0.37 27 940x560x440 carton
WZL G35PF 9~36 90~358 230V 50Hz 0.37 29 1010x565x440 carton
Eacoon Two-Stage Operation of One-Stage Gas BurnerEACOON R&D team is constantly seeking to use the latest 3D CAD system and well-equipped laboratory and high-tech simulated working environment to achieve better performance. In particular, R&D laboratories are equipped with precise electronic quasi-magnetic infrared and ultraviolet combustion analysis equipment, digital multiscale acoustic equipment, evolutionary oscillators interfaced with computerized data acquisition systems, and integrated multifunctional tools for performance analysis and long-term testing . In addition, EACOON has independently developed two-fluid, low-nitrogen and ultra-low-nitrogen, and high-concentration organic waste liquid incinerators based on European advanced cutting-edge technology and according to the special working conditions of domestic hazardous waste and waste-to-energy projects. And other technologies, a total of more than 60 national patents. Combustion and electronics specialists analyze and implement new technology solutions ensuring superior performance and reliability.
CFD simulation technology
Using CFD simulation technology, the finite element analysis and calculation of the flow field inside the burner and the furnace is carried out, and the basis and theoretical data of the temperature, pressure, flow rate, and flue gas composition in the entire combustion reaction area are obtained, providing guidance for the development of new technologies for combustion equipment .
 
Eacoon Two-Stage Operation of One-Stage Gas Burner
Eacoon Two-Stage Operation of One-Stage Gas BurnerEacoon Two-Stage Operation of One-Stage Gas BurnerEacoon Two-Stage Operation of One-Stage Gas BurnerEacoon Two-Stage Operation of One-Stage Gas BurnerEacoon Two-Stage Operation of One-Stage Gas Burner
Pre-sale Service

· Arrange professional salesmen to contact with customers timely, and understand the needs of customers preliminary.
· According to customer needs to provide professional technical support, but also canprovide video quidance and simulated experiment;
· Based on the final actual conditions to provide the best technical parameters and select the best pump type.

After-sales Service

· Once the salesman receives the customers feedback, communicate and provide the best solution timely.
· When the customer's improper operation causes the problems, the salesman should inform the customer correct use method timely;
· Salesman mail return to visits regularly and ensure every customer will satisfaction.


 
 
 
 
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier